Natural gas is one of the most widely implemented and easily accessible fuels in general. The extensive network of gas pipelines, distribution networks, international connections and gasification centres in the country's main ports have turned Spain into a completely gasified territory.

Due to their ease of use, cleanliness, the fact that they do not require storage facilities, their low price, their high energy content, their low levels of pollution and the security of supply, natural gas installations have vp risk email list become leaders when it comes to obtaining thermal energy for different uses, both domestic, commercial and industrial. As if that were not enough, natural gas installations do not present too much complexity. In addition, there is a wide range of installers and maintenance technicians accredited by the competent authorities to carry out the necessary work.

Steps prior to installing natural gas

However, before starting the design and implementation of natural gas facilities, a number of aspects must be taken into account:

Check that the supply network reaches our location: If we want to install a new natural gas supply in a medium or large city, we can be almost certain that the distribution network reaches the area surrounding our property. But what happens in the case of smaller towns? In the case of isolated locations or small towns, a prior consultation will be necessary, as it may be necessary to carry out work to expand the networks in the area.

Image


Check if the building has a natural gas installation: Even if our home does not have a natural gas installation, the building or community may have the receiving installation and we only have to carry out the part corresponding to the individual derivation.
Hire an authorised installer: Once the availability of fuel has been confirmed, it is necessary to contact an installation company authorised by the Autonomous Community. These organisations usually have updated lists of accredited technicians for each type of installation available to citizens.
Hire a designer if necessary: ​​Depending on the size of the installation, it may be necessary to draw up a technical project. In the case of individual installations larger than 70kW or common installations larger than 2000kW, a project must be drawn up by an engineering professional who will also direct the execution of the work, certifying at the end of the work that the installation complies with the current reference regulations.